Service category · Completions
Cementing
Cementing places cement slurry in the annulus around casing or liner for isolation and support, and also covers remedial squeezes and plugs in existing wells.
A cementing crew mixes and pumps a designed slurry, displaces it into position and reports volumes, pressures and returns. Primary work isolates zones behind new casing. Remedial work repairs leaks or sets plugs. You receive a job report, a slurry test record and, where used, a bond evaluation.
Where it sits in the life of a well
Ordered by the drilling or completions engineer for each casing string, and by the well-servicing foreman for repairs or abandonment, with design lead time before the job.
- 01Build the siteSurvey the lease, build the access road and pad, and bring in the camp, rentals and utilities the job will need.
- 02DrillMove the rig in, drill and case the well, and manage fluids, solids and directional control along the way. (main stage for this service)
- 03Complete and stimulateCement, perforate, fracture and clean out the well, then flow it back and test it. (also used at this stage)
- 04Produce and interveneLift, treat and haul production, and bring service rigs, coil and wireline back when the well needs work.
- 05Facilities and pipelineBuild and maintain the batteries, compressor stations, plants and pipelines that move and process what the wells produce.
- 06Abandon and reclaimAbandon the well and pipelines, remove the equipment, assess the site and return the land to its former use. (also used at this stage)
What to specify
Write these down before you ask for a price, so every provider quotes the same job.
- Casing or liner size, setting depth and hole condition from the program
- Cement type, density and additives, or the supplier's design from well data
- Primary or remedial purpose, such as isolation, squeeze or plug
- Casing accessories to be supplied and who runs them
- Volume and top-of-cement target, with excess assumptions
- Water, power and storage on location
- Testing requirements, such as bond log or pressure test, and who arranges them
- Sequence with rig, wireline and surface handling of returns
What to ask the provider
- Who designs the slurry and what well data do you need from me to do it?
- What laboratory testing do you run and when do I see results?
- How do you handle lost returns or a failed job and how does that bill?
- What do you supply for casing accessories and what comes from the rig side?
- How do you handle returns and waste cement at surface?
- What job records do you deliver and when?
Where quotes usually differ
Check each quote for these before you compare totals.
- Whether excess volume and additives are priced in or extra
- Whether casing accessories and lab testing are inside the quote
- Treatment of a failed job or remedial squeeze
- Whether waste cement disposal and returns handling are included
Cementing companies
21 companies in the directory are listed under cementing, in alphabetical order. 2 have it as the primary service; the rest list it alongside another main line.
| Company | Primary service | Head office | Offices and yards | Named service areas | Sources checked |
|---|---|---|---|---|---|
| A10 Fabrication | Welding and fabrication | McKerrow, Ontario | McKerrow | None named | |
| Bri-Chem | Production chemicals | Acheson, Alberta | Acheson | Western Canada | |
| Caliber Energy Systems | Well servicing rigs | High Level, Alberta | High Level | None named | |
| Canadian Downhole | Fishing and downhole tools | Edmonton, Alberta | Edmonton | None named | |
| Crane & Timber | Crane and lifting | Winnipeg, Manitoba | Winnipeg | None named | |
| Darlington Steel | Welding and fabrication | Whitby, Ontario | Whitby | None named | |
| Dragon Stone Energy | Production chemicals | Calgary, Alberta | Calgary | None named | |
| DT Welding & Erections | Specialist and supporting services | Alvinston, Ontario | Alvinston | None named | |
| H&P Energy Services | Drilling | Airdrie, Alberta | Airdrie | None named | |
| Hoffman's Tank Truck Service | Steam / pressure | Elk Point, Alberta | Elk Point | None named | |
| Magnum Cementing Services | Cementing | Not published | Not published | None named | |
| Martin’s Crane Rental | Trucking / hauling | Saint John, New Brunswick | Saint John | None named | |
| Niagara Rigging and Erecting | Crane and lifting | Thorold, Ontario | Thorold | None named | |
| OE Utility Services | Vacuum / hydrovac | Vaughan, Ontario | Vaughan | None named | |
| Performance Energy Services Inc. | Completions | Calgary, Alberta | Calgary, Red Deer, Kindersley, Whitecourt +3 | None named | |
| Prairie Rathole Services Ltd. | Surface hole / conductor | Estevan, Saskatchewan | Estevan | None named | |
| Sanjel Energy Services Inc. | Cementing | Not published | Not published | None named | |
| SERVA Group | Artificial lift and production | Calgary, Alberta | Calgary | None named | |
| Stingray Well Solutions | Steam / pressure | Red Deer, Alberta | Red Deer | Western Canada | |
| Total Containment | Inspection / NDT | Nisku, Alberta | Nisku | None named | |
| Western Brushing & Ditching Ltd. | Civil / earthworks / site prep | Terrace, British Columbia | Terrace | None named |
Office towns for this service
Quick answers
What is cementing?
Cementing places cement slurry in the annulus around casing or liner for isolation and support, and also covers remedial squeezes and plugs in existing wells.
What does a cementing provider do on the job?
A cementing crew mixes and pumps a designed slurry, displaces it into position and reports volumes, pressures and returns. Primary work isolates zones behind new casing. Remedial work repairs leaks or sets plugs. You receive a job report, a slurry test record and, where used, a bond evaluation.
When is cementing ordered?
Ordered by the drilling or completions engineer for each casing string, and by the well-servicing foreman for repairs or abandonment, with design lead time before the job.
What should I have ready before asking for a cementing price?
Have these ready: casing or liner size, setting depth and hole condition from the program; cement type, density and additives, or the supplier's design from well data; primary or remedial purpose, such as isolation, squeeze or plug; casing accessories to be supplied and who runs them; volume and top-of-cement target, with excess assumptions.
How is cementing usually quoted?
Common structures: per-job lump sum with a defined volume; per-sack or per-cubic-metre rate for cement; hourly or day rate for the crew and units; additives, accessories, extra volume and standby sit outside the base rate. Rates vary by job and season, so get them in writing.
Where do cementing quotes usually differ?
Check each quote for: whether excess volume and additives are priced in or extra; whether casing accessories and lab testing are inside the quote; treatment of a failed job or remedial squeeze; whether waste cement disposal and returns handling are included.
Often needed on the same job
- Abandonment23 companies
- Completions40 companies
- Drilling and completion fluids28 companies
- Surface hole / conductor11 companies
How the equipment works
Equipment lessons are published by AlbertaOil.ca, a separate site.
- Browse the full equipment atlasAlbertaOil.ca