Part one: the work and the outcome you need
Describe the result you need, not only the service. Say what must be true when the work is finished, who will accept it and how. A line such as the vessel is cleaned and ready for inspection tells a provider more than a request for a crew. List the activities you expect, and flag anything you are unsure about so providers can state their assumption.
Name the scope boundary. Say what is in, what is out and what you will decide later. Attach drawings, photographs, earlier reports or a scope sheet where you have them. Providers who see the same material price the same job.
- The result you need and the test of whether it has been achieved.
- Who accepts the work, and what paperwork closes it out.
- The activities you expect, with unknowns marked as unknowns.
- Anything you are deliberately leaving for a later decision.
Part two: location and access
Give the site description in a form providers can use, and say how a crew reaches it. Cover the road type, the season it can be used, gates, locked access and any landowner or lease conditions. Say whether the crew will find a pad, a road or an open field, and how large equipment gets in. Do not leave a provider to discover this on arrival.
- Site description and the nearest town or facility.
- Route in, road restrictions and seasonal limits on use.
- Gate, lock or check-in procedure, and who holds the keys or code.
- Landowner or lease contact and any notification requirements.
- Where equipment can park, turn and stage.
Part three: timing and duration
Give a start window, not only a start date, and say how firm it is. State the expected duration and what could change it. Say whether work runs days, nights or around the clock, and whether it depends on a shutdown, a rig schedule or another contractor finishing first. Providers price a firm date differently from a flexible one, so say which you have.
Say what you will do if the work slips: whether you want a standby rate, a new quote or the option to cancel. Ask providers how much notice they need to mobilize and how their price changes with short notice.
- A start window and how firm it is.
- Expected duration and what could extend it.
- Working hours, shifts and any seasonal limits.
- Dependencies on a shutdown, a rig move or another contractor.
Part four: site conditions and interfaces with other contractors
Describe what the crew will meet: ground, weather exposure, known hazards such as live equipment, overhead lines, tight spaces and neighbouring operations. Say who else will be on the site, who controls it and who coordinates. When several contractors share a site, one provider's delay becomes another's standby, so say who directs the work.
Name your site orientation, permit and communication requirements, and say who provides each. Ask providers to list the site conditions they assumed, so a surprise on arrival is an agreed change rather than an argument. Say how crews check in, who they report to each day and how a change on site gets approved.
Part five: what you supply and what the provider supplies
The most common cause of an uncomparable quote is an unstated assumption about who brings what. Decide each item before you send the enquiry and write it down. Where you cannot decide, ask the provider to price both ways. Confirm any regulatory or site requirement with the regulator or your site owner rather than relying on a provider's reading.
| Item | Who normally decides | Question to settle in writing |
|---|---|---|
| Site access, lease and road upkeep | You | Who maintains the route and who pays for damage to it |
| Fuel, power and water | You or the provider, by agreement | Who supplies them on site and how they are charged |
| Disposal or dump site | You, often with the provider's recommendation | Who selects the site and who pays haul and tipping |
| Consumables and small materials | The provider, unless stated | What the rate includes and what is billed at cost |
| Specialized tools and ancillary equipment | The provider or a third party | Who supplies it and who is responsible if it is lost or damaged |
| Permits and notifications | You, unless the contract says otherwise | Who applies, who holds them and who pays |
| Accommodation, meals and travel | The provider, unless you arrange a camp | Who arranges and pays for them |
Part six: how you want the quote laid out
Tell providers the format you want so replies can be compared line by line. Ask for the price broken into mobilization and demobilization, base charge by unit, standby, minimums, travel, consumables, disposal and taxes, with assumptions and exclusions listed separately. Ask providers to state how long the quote is valid and what could change the price after award.
Ask for the units used, such as hour, day, shift, metre or load, and for the definition of each. Ask for optional items to be priced separately from the base scope and for a named contact who can answer questions. Set a reply date and say when you will confirm the result.
- Mobilization and demobilization shown as their own lines.
- Base charge by defined unit, with the minimum stated.
- Standby, travel and consumables as separate lines.
- Assumptions, exclusions and optional items listed apart from the base price.
- Validity of the quote and what could change the price after award.
Send it, then keep the record
Send the same enquiry to every provider at the same time. Answer questions in writing and share each answer with everyone, so no provider prices from a different brief. Keep a record of the questions, the answers and any change in scope, and confirm the final scope back to the successful provider before work starts.
How quotes end up not comparable
- Providers receive different drawings or information, so each prices a different job.
- Access, standby and disposal are left unstated, then appear as extras.
- Quotes arrive in different layouts and units, and the comparison relies on guesses.
- A verbal answer to one provider's question never reaches the others.
- The start date is firm in the enquiry but flexible in practice, so providers price for the wrong risk.
This guide is general buying guidance for a conversation with a provider. It is not engineering, legal or safety advice. Confirm current regulatory requirements with the regulator for your province.